GUPPY - THE LIFEGUARD SHACK

GUPPY - THE LIFEGUARD SHACK

Monday, 5 August 2019

The job seems dauntingly difficult but these images of the fun past I had with this little Shasta compact is the reason I soldier on....







Wednesday, 31 July 2019

Understanding the Electrical System, Part One.... remember what you removed from where....














Caboose Tear Down Stage:  This takes forever as one small section or item needs removing before the next piece can come off....









Thursday, 18 July 2019

The slow removal of interior crushed ceiling.  Before I can remove the tin roof outside, I needed to remove the broken ceiling wood struts and the curb side and road side cupboards that either had fallen off or were putting tremendous weight on the side walls.  The door frame is split and broken and the back window and wall will need to be removed later as water damage penetrated the wood in that are.  I don't want her to collapse entirely so I'm getting ready to brace sections from the inside before I remove the tin roof that has split along the s-seam breaks.






Friday, 24 May 2019

Wednesday, 15 May 2019

Northern Canada Snow Load Damage

I am trying to remain positive.
It’s a roof.
It was snow load damage in the northern hemisphere.
It can be fixed.
It wasn’t swept away by a flood.
It’s salvagable. 
(Repeating this message over and over can help convince me not to put a for sale sign on this Old Crowe Avenue camper)