GUPPY - THE LIFEGUARD SHACK

GUPPY - THE LIFEGUARD SHACK

Thursday, 18 July 2019

The slow removal of interior crushed ceiling.  Before I can remove the tin roof outside, I needed to remove the broken ceiling wood struts and the curb side and road side cupboards that either had fallen off or were putting tremendous weight on the side walls.  The door frame is split and broken and the back window and wall will need to be removed later as water damage penetrated the wood in that are.  I don't want her to collapse entirely so I'm getting ready to brace sections from the inside before I remove the tin roof that has split along the s-seam breaks.